Cost effective - Installation of the OPTI-LOOP system is designed to be a one man, one tool, one truck, 30-45 minute operation. The stored length of cable can be lowered and reinstalled in minutes without disturbing the main run. The reduced cost associated with hardware, labor and equipment allows several OPTI-LOOP systems to be placed for the cost of one underground system. |